Smart Sipper Log Book

Design Studio 1

  • Met group members

  • Interviewed clients, gathered information to help define problem

Team Meeting 1

  • Completed team charter & Gnatt chart

Design Studio 2

  • Generated need statement, customer requirements and engineering specifications

Team Meeting 2

  • Completed QFD chart

  • Built low-fidelity prototype

Design Studio 3

  • Planned design review presentation

  • Completed Design Review #1 & Generated Feedback

Team Meeting 3

  • Competed revised prototype

  • Tried to generate ideas for electrolyte release mechanism

Design Studio 4

  • Completed design review 2 and took feedback

  • Planned electronic component of device and picked up sensors

Team Meeting 4

  • Worked on electronic component of high-fidelity prototype

Team Meeting 5

  • Planned out mechanical component of high-fidelity prototype

  • Organized things that we have done, and things we still have to do

Design Studio 5

  • Documented list of design changes of current prototype from original idea based on design review feedback

  • Refined code for electronic component of prototype

  • Modeled electrolyte release mechanism in Inventor and began printing

Week of Final Presentation

  • Met with group everyday

  • Assembled mechanical electrolyte release mechanism

  • Design optimization of electronic and mechanical components of design - finalization of prototype

  • Wrote Product Design Specification

  • Presentation preparation

  • Presented high-fidelity prototype at End-of-year Showcase!!!